STA323WQS
Electrical specifications
Figure 12. Test circuit 2
High Current Dead time for Bridge application = ABS(DTout(A)-DTin(A))+ABS(DTOUT(B)-DTin(B))
+VCC
Duty cycle=A
DTin(A)
INA
DTout(A)
M58
Q1
Q2
M64
OUTA
Rload=4Ω
DTout(B)
OUTB
L67 10µ
Iout=1.5A
L68 10µ
Iout=1.5A
M57
Q3
C69
470nF
C71 470nF
C70
470nF
Q4
M63
Duty cycle=B
DTin(B)
INB
Duty cycle A and B: Fixed to have DC output current of 4A in the direction shown in figure
D06AU1651
4.5
Power supply and control sequencing
Figure 13 shows the recommended power-up and power-down sequencing. The "time zero"
reference point is taken where VCC crosses the under voltage lockout threshold.
Figure 13. Recommended power up and power down sequence
21/78